Our company produce vertical turbine pump,vertical long axis pump, vertical type condensate pump ,vertical wet pit pump,right Angle gear box.

Manufacturer of vertical turbine pump

Focus on vertical wet pit pump, right Angle gear box

008618507312158

008613974960765

QQ: 545492904 506677082

Current Location: HOME ?Knowledge ?vertical turbine pump

Priming and auxiliary supplies Of The Vertical Turbine Pumps (VTP pumps)

Date:2024/11/20 22:34:35

Views:


Source:Vertical Turbine Pump Manufacturer and Vertical Suspension Pump Prices Provider

Priming and auxiliary supplies Of The Vertical Turbine Pumps (VTP pumps)

Ensure electrical, hydraulic, pneumatic, sealant and lubrication systems (as applicable) are connected and operational.

Ensure the inlet pipe and pump casing are completely full of liquid before starting continuous duty operation.

Pump submergence

Minimum submergence is required to prevent vortex formation.

The submergence varies in general from 2 to 3 times the nominal bowl diameter and is always specific to each pump model. The submergence needed for adequate NPSH to the first stage impeller may be different from the general rule mentioned earlier.

Location of the first stage impeller eye to be taken into account for minimum priming submergence. It is also equally important to take note of the minimum distance to be maintained to the suction bell from the sump floor (with or without strainer). Therefore, refer to the Flowserve supplied general assembly drawing on minimum submergence or contact Flowserve before the pump is started.

Priming and auxiliary supplies Of The Vertical Turbine Pumps (VTP pumps).jpg

Parners

LINKS

073184800558

073184810558

008618507312158

008613974960765

Wechat QR code